Leisure Centre and Swimming Pools Scarborough
01.06.2016
Fast Form have provided wall and base shutters for the stunning new Swimming pools at Scarborough leisure centre, a combination of straight and curved walls and bases all requiring first class finishes. Fast Form’s ability to be installed by hand has meant that tens of thousands of £’s has been saved on craneage alone and it was the ideal system inside where a crane could not reach. There has also been a dramatic cut in the Carbon footprint of around 60% compared to other traditional systems.